Project Description Project Scope Client Owner
Slurry Preparation Plant-Horizon Train 1&2 Piping Isometrics ThyssenKrupp CNRL
Caustic Addition System for OPP-Horizon Train 1&2 Inspection, start-up and commissioning CNRL CNRL
Fire Protection System-Horizon Train 1&2 Piping Isometrics CNRL CNRL
Confidential R&D Project Engineering and Design Penn West Energy Penn West Energy 
Refinery Conversion Project (RCP1.1) Utilities and Offsite - Heat Tracing Design & HT Isometrics Bantrel Petro Canada
Steam Generation Unit Engineering and Supply CNRL CNRL
Glycol/Water Heating System Piping Layout and Design Washington Group Northern Ltd/Calgarig Enmax
Caustic Addition System for OPP-Train 3 Technical Specification CNRL CNRL
Belt Wetting System- Horizon Train 3 Engineering & Supply ThyssenKrupp CNRL
Caustic Addition System for OPP-Train 3 Engineering, Supply and Construction CNRL CNRL
Belt Wetting System- Horizon Train 4&5 Engineering & Supply FAM CNRL
Utility Air (CP 1&2, SB), Process Air (SB), Bull Horn Piping & Belt Wetting Piping P&IDs, LDTs, 3D model, Piping Isometrics, ABSA Registration, Data Sheets FAM Fort Hills
Spray Bars, Dribble Bars, Wash Bars & Bull Horn Sprayer Design FAM Fort Hills
Utility Air, Instrument Air, Fire Protection Piping, BW Piping, Spillage Chute Piping - Horizon Train 4&5 P&IDs, LDTs, 3D model, Piping Isometrics, ABSA Registration, Data Sheets FAM CNRL
Belt Wetting- Kearl Plant 1 Piping Isometrics ThyssenKrupp Imperial Oil
Crusher Utility Air - Plant 10&11 - Mildred Lake P&ID, LDT, ABSA Registration ThyssenKrupp Syncrude Canada
SB Utility Air - Trains 1 thu 4 - Mildred Lake P&ID, LDT, ABSA Registration ThyssenKrupp Syncrude Canada
CP Utility Air - KEP Oil Sands P&ID, LDT, ABSA Registration ThyssenKrupp Imperial Oil
SB Proces & Utility Air - Kearl Oil Sands P&ID, LDT, ABSA Registration ThyssenKrupp Imperial Oil
Instrument&Utility Air, Ore Prep Wet - Kearl Oil Sands P&ID, LDT, ABSA Registration ThyssenKrupp Imperial Oil